{"id":7517,"date":"2023-01-17T16:01:25","date_gmt":"2023-01-17T09:01:25","guid":{"rendered":"https:\/\/achisonsafety.com.vn\/?p=7517"},"modified":"2023-01-17T16:10:46","modified_gmt":"2023-01-17T09:10:46","slug":"lockout-tagout-steps-for-construction-sites","status":"publish","type":"post","link":"https:\/\/achisonsafety.com.vn\/en\/lockout-tagout-steps-for-construction-sites\/","title":{"rendered":"Lockout Tagout Steps for Construction Sites"},"content":{"rendered":"<p>Help prevent hazards and control electrical energy at construction sites with this four-step safety plan to an effective LOTO program.<\/p><p>Construction sites by their very nature are areas of increased risk. Since the construction of a building is literally a work in progress, there are many components on a construction site that are potentially hazardous to both the workers and the general public. Equipment on the site is not permanently anchored, some workers may be unfamiliar with the equipment and their inherent hazards, and written&nbsp;operating instructions&nbsp;and warnings may not be consistently displayed. Add to this the multiple subcontractor workforces that leave their imprint on the site, as well as the occasional onlookers and trespassers, and the potential for danger increases&nbsp;significantly. OSHA has regulations mandating construction site safety, and the failure to comply may result in heavy fines or serious injury.<\/p><p>Regulations governing the locking out and tagging out (LO\/TO) of potentially hazardous equipment are of particular concern. Technically, the construction industry is exempt from the Control of Hazardous Energy (LO\/TO) OSHA regulation 1910.147. However, Standard 1910.147 does apply to construction companies doing electrical work in their shops or on their own premises.<\/p><p>However, there are OSHA regulations for various Code of Federal Regulations (CFR) 1926 (construction standards) violations requiring that best practices for LO\/TO be observed. Following are several OSHA regulations that apply to LO\/TO:<\/p><p>CFR&nbsp;1926.20 \u2014 General safety and health provisions for construction<\/p><p>CFR 1926.21(b)(2) \u2014 Concerning unsafe conditions<\/p><p>Section 5(A)(1) of the OSHA Act, the General Duty Clause \u2014 This can refer to LO\/TO on the construction site, as it\u2019s a recognized hazard to which employees are exposed.<\/p><p>CFR 1926.417 \u2014 Safety for exposed wiring&nbsp;<\/p><p>CFR&nbsp;1926.403 \u2014 The guarding of electrically live parts<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_71 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">N\u1ed9i dung trang<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/achisonsafety.com.vn\/en\/lockout-tagout-steps-for-construction-sites\/#Controlling_Electrical_Energy_Onsite\" title=\"Controlling Electrical Energy Onsite\">Controlling Electrical Energy Onsite<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/achisonsafety.com.vn\/en\/lockout-tagout-steps-for-construction-sites\/#4-Step_Plan_to_an_Effective_LOTO_Program\" title=\"4-Step Plan to an Effective LO\/TO Program\">4-Step Plan to an Effective LO\/TO Program<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/achisonsafety.com.vn\/en\/lockout-tagout-steps-for-construction-sites\/#STEP_1_Develop_and_document_an_energy_control_program_with_written_procedures\" title=\"STEP 1: Develop and document an energy control program&nbsp;with written procedures.\">STEP 1: Develop and document an energy control program&nbsp;with written procedures.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/achisonsafety.com.vn\/en\/lockout-tagout-steps-for-construction-sites\/#STEP_2_Identify_and_mark_all_energy_control_points\" title=\"STEP 2: Identify and mark all energy control points.\">STEP 2: Identify and mark all energy control points.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/achisonsafety.com.vn\/en\/lockout-tagout-steps-for-construction-sites\/#STEP_3_Train_employees_communicate_procedures_and_conduct_periodic_inspections\" title=\"STEP 3: Train employees, communicate procedures and conduct periodic inspections.\">STEP 3: Train employees, communicate procedures and conduct periodic inspections.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/achisonsafety.com.vn\/en\/lockout-tagout-steps-for-construction-sites\/#STEP_4_Equip_employees_with_the_proper_lockout_tools_and_warning_devices\" title=\"STEP 4: Equip employees with the proper lockout tools and warning devices.\">STEP 4: Equip employees with the proper lockout tools and warning devices.<\/a><\/li><\/ul><\/nav><\/div>\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Controlling_Electrical_Energy_Onsite\"><\/span>Controlling Electrical Energy Onsite<span class=\"ez-toc-section-end\"><\/span><\/h3><p>OSHA can also refer to the machinery standard indicating that machines have specific disconnects that can be locked out to enforce safe de-energization work practices on construction sites. A primary concern on construction sites is the control of electrical energy. Typically, power generators are used at the beginning of a construction project.<\/p><p>As construction progresses, contractors switch to temporary electrical power, from which they draw their electrical supply needs until they finally switch over to main power. That doesn\u2019t usually occur until the finishing stages of the project. A potential hazard can occur during the timeframe when both main electrical power and residual power (e.g., for emergency lighting) are live. There are separate breakers for main electrical and residual power. Both sources of electrical power need to be locked out and tested for safety before performing any equipment servicing\/maintenance work. Additionally, generators must be tagged out for non-use and \u201cneeds repair\u201d conditions. Not doing this can lead to a serious accident if the generator is energized.<\/p><p>Another common electrical hazard on a construction site is the potential to hit live wires while excavating. It is possible that old utility lines can still be energized. It is important to verify the location of all electrical lines on the site and make sure that they are not live in the area that is being excavated.<\/p><div data-block-name=\"woocommerce\/handpicked-products\" data-products=\"[6111,6024,6025]\" class=\"wc-block-grid wp-block-handpicked-products wc-block-handpicked-products has-3-columns has-multiple-rows\"><ul class=\"wc-block-grid__products\"><li class=\"wc-block-grid__product\">\n\t\t\t\t<a href=\"https:\/\/achisonsafety.com.vn\/en\/san-pham\/lockout-tagout-loto-cb-brady\/\" class=\"wc-block-grid__product-link\">\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"wc-block-grid__product-image\"><img loading=\"lazy\" decoding=\"async\" width=\"247\" height=\"247\" src=\"https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/1-6-247x247.png\" class=\"attachment-woocommerce_thumbnail size-woocommerce_thumbnail\" alt=\"Lockout Tagout (LOTO) CB Brady\" srcset=\"https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/1-6-247x247.png 247w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/1-6-400x400.png 400w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/1-6-280x280.png 280w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/1-6-30x30.png 30w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/1-6-60x60.png 60w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/1-6-510x510.png 510w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/1-6-100x100.png 100w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/1-6.png 600w\" sizes=\"(max-width: 247px) 100vw, 247px\" title=\"\"><\/div>\n\t\t\t\t\t<div class=\"wc-block-grid__product-title\">Lockout Tagout (LOTO) CB Brady<\/div>\n\t\t\t\t<\/a>\n\t\t\t\t<div class=\"wc-block-grid__product-price price\"><span class=\"amount\">Contact<\/span><\/div>\n\t\t\t\t<div class=\"wc-block-grid__product-rating\"><div class=\"star-rating\" role=\"img\" aria-label=\"Rated 5.00 out of 5\"><span style=\"width:100%\">Rated <strong class=\"rating\">5.00<\/strong> out of 5 based on <span class=\"rating\">1<\/span> customer rating<\/span><\/div><\/div>\n\t\t\t\t<div class=\"wp-block-button wc-block-grid__product-add-to-cart\"><a href=\"https:\/\/achisonsafety.com.vn\/en\/san-pham\/lockout-tagout-loto-cb-brady\/\" aria-label=\"Read more about &ldquo;Lockout Tagout (LOTO) CB Brady&rdquo;\" data-quantity=\"1\" data-product_id=\"6111\" data-product_sku=\"\" data-price=\"0\" rel=\"nofollow\" class=\"wp-block-button__link  add_to_cart_button\">Read more<\/a><\/div>\n\t\t\t<\/li><li class=\"wc-block-grid__product\">\n\t\t\t\t<a href=\"https:\/\/achisonsafety.com.vn\/en\/san-pham\/safety-lock-loto-brady-prinzing-cb-electric-stainless-steel-cuffs\/\" class=\"wc-block-grid__product-link\">\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"wc-block-grid__product-image\"><img loading=\"lazy\" decoding=\"async\" width=\"247\" height=\"247\" src=\"https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/bai-2e-247x247.jpg\" class=\"attachment-woocommerce_thumbnail size-woocommerce_thumbnail\" alt=\"Kh\u00f3a an to\u00e0n LOTO Brady Prinzing CB \u0111i\u1ec7n c\u00f2ng th\u00e9p kh\u00f4ng g\u1ec9\" srcset=\"https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/bai-2e-247x247.jpg 247w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/bai-2e-400x400.jpg 400w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/bai-2e-280x280.jpg 280w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/bai-2e-30x30.jpg 30w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/bai-2e-60x60.jpg 60w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/bai-2e-510x510.jpg 510w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/bai-2e-100x100.jpg 100w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/bai-2e.jpg 640w\" sizes=\"(max-width: 247px) 100vw, 247px\" title=\"\"><\/div>\n\t\t\t\t\t<div class=\"wc-block-grid__product-title\">Safety Lock LOTO Brady Prinzing CB electric stainless steel cuffs<\/div>\n\t\t\t\t<\/a>\n\t\t\t\t<div class=\"wc-block-grid__product-price price\"><span class=\"amount\">Contact<\/span><\/div>\n\t\t\t\t\n\t\t\t\t<div class=\"wp-block-button wc-block-grid__product-add-to-cart\"><a href=\"https:\/\/achisonsafety.com.vn\/en\/san-pham\/safety-lock-loto-brady-prinzing-cb-electric-stainless-steel-cuffs\/\" aria-label=\"Read more about &ldquo;Safety Lock LOTO Brady Prinzing CB electric stainless steel cuffs&rdquo;\" data-quantity=\"1\" data-product_id=\"6025\" data-product_sku=\"\" data-price=\"0\" rel=\"nofollow\" class=\"wp-block-button__link  add_to_cart_button\">Read more<\/a><\/div>\n\t\t\t<\/li><li class=\"wc-block-grid__product\">\n\t\t\t\t<a href=\"https:\/\/achisonsafety.com.vn\/en\/san-pham\/safety-lock-loto-brady-prinzing-cb-electric-plastic-cuffs\/\" class=\"wc-block-grid__product-link\">\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"wc-block-grid__product-image\"><img loading=\"lazy\" decoding=\"async\" width=\"247\" height=\"247\" src=\"https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/khoa-loto-dien-cong-nhua-xanh-la-1-247x247.png\" class=\"attachment-woocommerce_thumbnail size-woocommerce_thumbnail\" alt=\"Safety lock LOTO Brady Prinzing CB electric plastic cuffs\" srcset=\"https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/khoa-loto-dien-cong-nhua-xanh-la-1-247x247.png 247w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/khoa-loto-dien-cong-nhua-xanh-la-1-400x400.png 400w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/khoa-loto-dien-cong-nhua-xanh-la-1-280x280.png 280w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/khoa-loto-dien-cong-nhua-xanh-la-1-30x30.png 30w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/khoa-loto-dien-cong-nhua-xanh-la-1-60x60.png 60w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/khoa-loto-dien-cong-nhua-xanh-la-1-100x100.png 100w, https:\/\/achisonsafety.com.vn\/wp-content\/uploads\/2022\/07\/khoa-loto-dien-cong-nhua-xanh-la-1.png 500w\" sizes=\"(max-width: 247px) 100vw, 247px\" title=\"\"><\/div>\n\t\t\t\t\t<div class=\"wc-block-grid__product-title\">Safety lock LOTO Brady Prinzing CB electric plastic cuffs<\/div>\n\t\t\t\t<\/a>\n\t\t\t\t<div class=\"wc-block-grid__product-price price\"><span class=\"amount\">Contact<\/span><\/div>\n\t\t\t\t\n\t\t\t\t<div class=\"wp-block-button wc-block-grid__product-add-to-cart\"><a href=\"https:\/\/achisonsafety.com.vn\/en\/san-pham\/safety-lock-loto-brady-prinzing-cb-electric-plastic-cuffs\/\" aria-label=\"Read more about &ldquo;Safety lock LOTO Brady Prinzing CB electric plastic cuffs&rdquo;\" data-quantity=\"1\" data-product_id=\"6024\" data-product_sku=\"\" data-price=\"0\" rel=\"nofollow\" class=\"wp-block-button__link  add_to_cart_button\">Read more<\/a><\/div>\n\t\t\t<\/li><\/ul><\/div><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4-Step_Plan_to_an_Effective_LOTO_Program\"><\/span>4-Step Plan to an Effective LO\/TO Program<span class=\"ez-toc-section-end\"><\/span><\/h3><p>What measures can be put in place to help reduce the potential for accidents and injury on a construction site? By implementing the following 4-Step Plan, contractors will be following best practices for controlling energy.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"STEP_1_Develop_and_document_an_energy_control_program_with_written_procedures\"><\/span>STEP 1: Develop and document an energy control program&nbsp;with written procedures.<span class=\"ez-toc-section-end\"><\/span><\/h3><p>A written lockout policy is the starting point. With respect to who is responsible for providing&nbsp;written procedures on a construction site, it depends upon how the project contract is written. It could be the general contractor, construction manager or electrical contractor. If the electrical contractor has to verify successful isolation and\/or control of the hazardous electrical energy, that party is usually the only one who can perform the lockout. (It\u2019s generally standard operating procedure to have the electrical contractor perform the lockout.) The procedures to be followed and the person responsible for implementing safety measures should be determined at the preconstruction conference.<\/p><p>After determining who is responsible for&nbsp;writing an&nbsp;energy control program, begin by documenting the program. Continue with machine-specific procedure development, training and periodic inspections. OSHA has a Lockout\/Tagout Tutorial on its website,&nbsp;<a href=\"http:\/\/www.osha.gov\/\" rel=\"nofollow noopener\" target=\"_blank\">www.osha.gov<\/a>, that provides additional advice. There are programs on the market, that include a thorough sample energy control policy that can serve as a guide as you develop your own comprehensive energy control program. Lockout&nbsp;Pro also allows you to create and manage clear and easy-to-follow visual, machine-specific procedures for&nbsp;most electrical equipment.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"STEP_2_Identify_and_mark_all_energy_control_points\"><\/span>STEP 2: Identify and mark all energy control points.<span class=\"ez-toc-section-end\"><\/span><\/h3><p>Locate and mark all energy control points, including valves, switches, breakers and plugs, with permanently placed labels or tags. It is important to use labels and tags made of durable materials to withstand exposure to the elements on a construction site. Cross-reference each label and tag with the corresponding step number in the posted energy control procedure for that equipment. Include information about the magnitude and purpose of the control point as stipulated by OSHA for electrical disconnects and recommended by ANSI for all isolating devices.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"STEP_3_Train_employees_communicate_procedures_and_conduct_periodic_inspections\"><\/span>STEP 3: Train employees, communicate procedures and conduct periodic inspections.<span class=\"ez-toc-section-end\"><\/span><\/h3><p>It is important to establish formal training programs for each of the three categories of employees for lockout: \u201cAuthorized,\u201d \u201cAffected\u201d and \u201cOther\u201d employees. OSHA provides advice on how to train for electrical safety.&nbsp;You must verify that&nbsp;your training is up to date. You can create or enhance a training program by using some of the training DVDs, handbooks and posters that are currently available. There is also software available that provides training modules and quizzes to help formalize and document effective training programs.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"STEP_4_Equip_employees_with_the_proper_lockout_tools_and_warning_devices\"><\/span>STEP 4: Equip employees with the proper lockout tools and warning devices.<span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ultimately, it\u2019s the proper and consistent application of the lockout hardware per established procedures that makes a successful lockout program. To this end, it\u2019s very important to know and document specifically what devices are acceptable for use at each and every lockout point. There is a tremendous range of sizes and shapes of valve operating handles, circuit breaker switches and various other energy control means. A leading lockout device provider will have developed product series that properly fit the majority of these. Because a construction site is more of an uncontrolled environment than an occupied building or plant, there is a greater safety risk for both authorized and unauthorized personnel. Using heavy-duty padlocks to lock all equipment when not in use and displaying visual warning signs that communicate hazards to workers and the general public will also help to reduce accidents.<\/p><p>Consistently following the four steps listed above will help contractors adhere to best practices for compliance with OSHA safety regulations regarding energy control on a construction site. This will result in increased personal safety, cost reductions and improved productivity.&nbsp;<\/p><p><em>Source: Brady Corporation<\/em><\/p>\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;7517&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;\u0110\u00e1nh gi\u00e1 ngay&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;24&quot;,&quot;title&quot;:&quot;Lockout Tagout Steps for Construction Sites&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 24px; height: 24px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 19.2px;\">\n            <span class=\"kksr-muted\">\u0110\u00e1nh gi\u00e1 ngay<\/span>\n    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p>Help prevent hazards and control electrical energy at construction sites with this four-step safety plan to an effective LOTO program. Construction sites by their very nature are areas of increased risk. Since the construction of a building is literally a work in progress, there are many components on a construction site that are potentially hazardous&#8230;<\/p>\n","protected":false},"author":2,"featured_media":7515,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[329,191],"tags":[],"class_list":["post-7517","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-safety-information","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/posts\/7517"}],"collection":[{"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/comments?post=7517"}],"version-history":[{"count":0,"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/posts\/7517\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/media\/7515"}],"wp:attachment":[{"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/media?parent=7517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/categories?post=7517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/achisonsafety.com.vn\/en\/wp-json\/wp\/v2\/tags?post=7517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}